I'm lucky, we have a dedicated sound and lighting tech. When I arrive at a gig the sound and lights are usually already set up. Takes me 20 mins to set up my rig.
Tear down is a different story, we all stay as we are required to help tear down sound and lights. Lots of heavy lifting.
Blue