<p>&nbsp;I&#39;ve already got one on ice for you man! &nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<div>On the blockwork front, we slowly seem to be getting there... here&#39;s how it looked by close of play on Friday with studio 4 being almost seven feet high:</div>
<div>&nbsp;</div>
<div>[IMG]http://i52.photobucket.com/albums/g28/Rimskidog/DSCN7161.jpg[/IMG]</div>

Link to comment
Share on other sites

[quote name='GremlinAndy' timestamp='1331505175' post='1574003']
I'm so envious watching this come together... I am completely green to my core.
[/quote]

Haha! Thanks man. Hope you are enjoying it. Once we get past this blockwork phase it all gets more interesting again!

Link to comment
Share on other sites

Something for the weekend sir?

The view you've become used to (don't ask me why they have cut a block around redundant conduit... I have no idea :facepalm:):

[IMG]http://i52.photobucket.com/albums/g28/Rimskidog/DSCN7184.jpg[/IMG]

Here's one from the reception end of the building (you can see the loading area door at the back):

[IMG]http://i52.photobucket.com/albums/g28/Rimskidog/DSCN7186.jpg[/IMG]

And here's one from the back door:

[IMG]http://i52.photobucket.com/albums/g28/Rimskidog/DSCN7180.jpg[/IMG]

Link to comment
Share on other sites

[quote name='51m0n' timestamp='1332283712' post='1586248']
So 2 out of 3 are nearly done?

wowzer....
[/quote]

Well, the outer walls of 2 out of 3 I guess. Cast concrete roofs going on all of them yet which is a big job all by itself, then 2 of them will have first fix electrics and be boarded, the other first fix then needs it's stone interior applied, then final fixes, then doors, aircon, treatment and paint... Ok, I might not go as far as nearly done yet...

Link to comment
Share on other sites

Anyways, here's a Friday update for ya. You can see here that the back wall of studio 3 is up to about 9 or 10 feet(ish):

[IMG]http://i52.photobucket.com/albums/g28/Rimskidog/DSCN7206.jpg[/IMG]

[IMG]http://i52.photobucket.com/albums/g28/Rimskidog/DSCN7205.jpg[/IMG]

Contractors tell me they will have the walls finished next week and will be shuttering the roofs the following week (yes, we are casting the concrete roofs in situ - am particularly looking forward to seeing them do this!)

Link to comment
Share on other sites

  • 2 weeks later...

Just realised I'd taken this and hadn't posted it. You can see that all three production rooms are now at full height waiting for their concrete roofs.

[IMG]http://i52.photobucket.com/albums/g28/Rimskidog/DSCN7222.jpg[/IMG]

As an aside, the rest of the studio is now being taken out of action so that the changes to the big room can take place and work on the control room can start.

Unfortunately, last week appeared to have been a builders holiday that nobody mentioned to me in advance because nobody turned up all week and their mobiles just went to answerphone. I have a site meeting with the main contractor first thing in the morning to discuss how we are going to sequence things from here. I'll let you know more once I've spoken to him.

Link to comment
Share on other sites

A little update on yesterday then. Had a good site meeting today with the main contractor and my architect. Things are going to start to happen quite quickly now it seems. Shuttering of the concrete roofs on the production rooms should start later this week. They are currently awaiting the shuttering and the metalwork recommended by the structural engineer. Props will arrive onsite tomorrow.

In a slightly unexpected move work will also start on the changes to the current live room and the control room tomorrow (unexpected because I thought we were not starting the control room until the production rooms were completely finished.) All of this will shorten this phase of the build by 4 weeks (which means I need to stop posting here and get on with ordering glass and audio cabling, sorting the electrician etc...)

As a reminder then, here's the overall floor plan we are working to (each room has much more detailed plans as you might expect but I'm afraid I wont be posting these in order to protect the IP in them - note also that the big room drawing isn't at all accurate, it doesnt show the non-paralel walls etc and is only there so that you can see clearly the overall studio plan):

[IMG]http://i52.photobucket.com/albums/g28/Rimskidog/DSCN7142.jpg[/IMG]

I'll keep you in the loop as it happens!

Edited by Rimskidog
Link to comment
Share on other sites

Cool.

Studio 2 being the control room in fact yeah? With a ickle vocal booth type thing off it opposite the main entrance door.

You are clearly going to be completely overworked with all this studio real estate to play with, you should give it to me and save yourself being worked into an early grave ;)

Nice to hear that the expected end date of the build is getting nearer rather than further away, that's more than a tad unusual!

Did the main contractor manage to find an excuse for not telling you of their unexpected hols then?

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...